| 
 
 Azerbaijan Oil
        Contracts 
  Karabakh Prospect No longer in operation
        after February 23, 1999.
 James A. Tilley, President CIPCO announced on January 21,
        1999 that they intend to cease operation on February 23, 1999.
        "We found gas, we found oil and we found gas condensate
        -- but we didn't find enough of it," CIPCO President James
        Tilley said. "There was quite a gap between what we found
        and what would be commercial, We needed roughly to find twice
        as much." CIPCO had invested some 100 million dollars (86 million euros)
        to drill three exploration wells in the Karabakh off-shore oil
        structure, located some 100 kilometers (62 miles) northeast of
        Baku, but discovered mostly gas. This was the second international
        contract signed. It is the first one to stop operations.The consortium
        had thought the structure contained six to seven million tons
        of recoverable oil reserves, 20-21 million tons of total reserves
        and 23 billion cubic meters of gas.
  
 Signed November 10, 1995
 Ratified February 13, 1996
 
 
   Map: Click to enlarge 
 The Caspian International Petroleum Company (CIPCO) is the
        joint operating company formed to explore and develop the Karabakh
        Prospect which is located about 125 kilometers east of Baku in
        the Azerbaijan sector of the Caspian Sea. The contractor parties
        in CIPCO are LUKoil (12.5%), Agip (5%), the joint-venture company
        LUKAgip (45%), Pennzoil (30%) and SOCAR (7.5%).
 CIPCO's day-to-day operations
        were conducted by a management team which reported to a committee
        of shareholder representatives. Positions rotated between the
        shareholder companies every three years. The first exploration well (KPS-1),
        drilled to a depth of 3,840 meters, revealed a gas accumulation,
        the extent of which was evaluated in the second and third wells.
        The second well (KPS-2), begun in April 1998, is located 5.5
        kilometers northwest of the first well and was drilled to a depth
        of approximately 4,000 meters. Drilling was carried out by
        the Caspian Drilling Company (CDC) on their semi-submersible
        rig, Dada Gorgud. The drilling process, including testing, 
 
 CIPCO
 Old Intourist Hotel
 63 Neftchilar Prospect, Baku
 Tel: (99-412) 92-40-27
 Fax: 92-40-07
 
 
 From Azerbaijan International (6.2) Summer 1998.
 © Azerbaijan International 1998. All rights reserved.
 
 Socar
        Contracts
 Back to Index
        AI 6.2
        (Summer 1998)
 AI
        Home |
        Magazine
        Choice
        | Topics
        | Store
        | Contact
        us
 |